This case study showcases the concrete pouring operations for the main structure of an underground project. The overall construction organization embodies the "layered, segmented, and symmetrical pouring" principle of underground structure constructi...
This case study showcases the concrete pouring operations for the main structure of an underground project. The overall construction organization embodies the "layered, segmented, and symmetrical pouring" principle of underground structure construction. A single continuous pour volume of 380 cubic meters was achieved, effectively controlling temperature cracking in the large-volume concrete.